ONGOING WORK UPDATE

The project team met with EGLE representatives in August to discuss the project. EGLE was receptive to a potential gravity outlet to the east; however, they requested additional study including the following data:

  • Wetland delineation and inventory.
  • Groundwater monitoring.
  • Lake Level and water quality monitoring.

Representatives of the project team have met with neighboring properties adjacent to Pine Lake to survey the proposed alignment of a potential gravity outlet and begin preliminary discussions for easement acquisition.

Currently we are conducting the following field work:

  • Monitoring well and staff gauge installation.
  • Wetland inventory and delineation.
  • Topographic survey.

See below for an updated schedule.