JUNE UPDATES

A second pump was installed north of Delton Road on May 5th and began operating on May 12th. The second pump will increase the rate of withdrawal from Upper Crooked Lake and discharge to the Delton Road Infiltration Basin.

EGLE conducted a virtual public hearing on May 21st to receive public feedback regarding the permit application submitted by BCDC for proposed outlet improvements to Cloverdale Lake and Long Lake and floodwater pumping from the Delton Road Infiltration Basin to the Delton Marsh.  On June 3, 2020, all comments received by EGLE were forwarded to BCDC and the Drainage District’s engineer for review.

The Drainage District’s engineer has started assembling construction bid documents for the Cloverdale Lake and Long Lake outlet improvements and floodwater pumping from the Delton Road Infiltration Basin to the Delton Marsh. An EGLE permit still must be received before additional floodwater conveyance can begin.